Motor aksling instrumentering for torque måling

Maskinprodusent ønsker løsning på torquemåling av motoraskling

Receipt of drawing of the shaft to be instrumented.
iManufacturing of two protective half-shells.
Reception of the shaft to be instrumented.
Surface preparation in the area where the gauges will be glued.
Bonding, wiring and closing.
Theoretical calculation of the output signal based on the diameter of the shaft, its material and the K-factor of the glued gauges.
Supply of a calibration resistor to facilitate calibration of the indicator.